Late-autumn sunlight on contemporary South Loop residential buildings across a calm blue-gray Chicago river.

What the Fire Stadium at The 78 Means for a South Loop Move Right Now

November 19, 2026

In July, Crain's Chicago Business reported that a Chicago-based landlord was looking to "cash out on a South Loop apartment tower that's poised to benefit from downtown rental demand and a nearby megaproject." That tower is 1333 S. Wabash. The headline put it "near The 78," the long-vacant riverfront site south of Roosevelt Road where Chicago Fire FC is building McDonald's Park.

The stadium is scheduled to open for the 2028 MLS season. The sales pitch for South Loop buildings already leans on it. If you're choosing between the South Loop and another downtown neighborhood this winter, the useful question is which parts of The 78 are steel in the ground, which are funded on paper, and which have already been dropped. Those three groups move on very different clocks.

Three South Loop rental towers changed hands or went up for sale in one summer

The Wabash listing was the second of three. In May, Crain's reported that Lendlease had listed The Cooper at Southbank for sale. The pitch to investors was a chance to capitalize on a nearby megadevelopment's momentum and on downtown's supply-constrained rental market. At the end of August, Crain's reported that Draper & Kramer had sold its 1130 S. Michigan high-rise for $166 million.

So between May and August 2026, three large South Loop apartment buildings were sold or offered to new owners, and at least two of the listings named The 78 as a reason to buy. The stadium is already part of how these buildings are being priced to investors, two seasons before its first match.

The rent numbers renters face this winter tell a slower story. The Real Deal reported in August that median net rent in downtown Class A buildings rose 5.4% year over year in the first quarter of 2026. By the third quarter, Crain's was reporting that downtown's rent surge was cooling, citing a stagnant job market and new development. Investor listings that price in 2028 are reaching the market in the same months that downtown rent growth has slowed, and a renter signing this winter is dealing with the slower market.

What is actually standing at 1331 S. Wells

The stadium is real and rising. Urbanize Chicago reported on October 26 that the city had issued the enclosure permit for McDonald's Park at 1331 S. Wells, just south of Roosevelt Road on the South Branch of the river. Foundation, tower crane and superstructure permits had already been issued. Pepper Construction, GMA Construction Group and All Construction Group are building it as a joint venture, aiming for the 2028 MLS regular season. Chicago YIMBY's construction photos showed the seating bowl taking shape in August and a second tower crane up by late September.

The building is a Gensler design with a brick facade, steel and glass, and a natural grass field. It will have more than 22,000 seats for soccer. The club's May announcement put capacity at up to 31,000 for concerts and special events. Owner Joe Mansueto is privately funding the $750 million stadium, according to the Fire's groundbreaking release from March. Urbanize also reported that the venue will host concerts, international matches and community events year-round, so the calendar will run past the MLS season.

The parts residents will use most are funded but not built

What you'll deal with on an ordinary Tuesday is the streets, the parking, the park and the river edge. Those come from a separate public package. In July, City Council approved $424.9 million in TIF funding for infrastructure around the stadium, not for the stadium itself. WTTW's coverage of the vote laid out what the money buys and what was taken out of the plan.

Piece of The 78 Status as of fall 2026
McDonald's Park stadium Under construction, enclosure permit issued in October
Connections to the street grid, including portions of Wells, 15th, Clark and Roosevelt Funded through the July TIF package
River wall repair and Metra track upgrades Funded through the July TIF package
1,200-space city-owned underground garage, leased by the Fire on game days Funded through the July TIF package
Public plaza on top of the garage, six acres of parkland Planned and funded
Red Line station at 15th and Clark Dropped
Housing and a hotel Listed by Related Midwest as potential Phase 1 additions

The garage was the most debated line in the package. WTTW reported that Ald. Bill Conway, Ald. Brian Hopkins and Ald. Daniel La Spata voted against that portion. Ald. Byron Sigcho Lopez voted against both parts. The dropped Red Line station had been part of the site's planning since the city's 2019 redevelopment agreement. Removing it changes how fans will reach the stadium, and that in turn decides which streets get the crowds.

Game nights, by the traffic study's numbers

A traffic study presented in September 2025, reported by Block Club Chicago, projected that 47% of fans would arrive by their own transportation, 40% by CTA or Metra, 10% by rideshare, and 3% on foot or by bike. The study planned for roughly 2,800 to 3,000 game-day parking spaces. It forecast arrival peaks from 6:30 to 7:30 p.m. and departure peaks from 9:30 to 10:30 p.m. Proposed measures included game-day street closures, parking restrictions, added transit service and shuttles from off-site lots.

With no new station at 15th and Clark, rail riders head for Roosevelt, the Red, Orange and Green line stop. The 2025 stadium proposal, as Streetsblog Chicago described it, routed those riders south from Roosevelt along a new LaSalle Street approach. A Wells Street approach from Polk was a second walking route. The stadium sits between 13th and 14th streets, west of the Wells Street connector. Dearborn Park and Burnham Station are across Clark to the east.

For someone touring apartments, the map comes down to this. On game nights, the streets that feed Roosevelt station and the Wells and LaSalle approaches will carry the evening crowd. Blocks east of Clark will feel the stadium less directly. At the Plan Commission hearing in September 2025, Block Club reported that Ald. Nicole Lee called game-day traffic an important open question. A community organizer asked for clearer plans on access and on coordination with the area's other big event venues. South Loop residents already plan around marathon closures, and stadium nights will be one more date to check against the calendar.

What a move this winter actually gets

A 12-month lease signed this winter ends before the stadium's first season. Through that lease, the stadium is a construction project and the garage, park and plaza are funded plans. The first season would arrive around your first renewal. That's the point where you'd see actual game-night traffic and could decide whether the blocks near Roosevelt suit you.

A buyer is looking at a longer horizon. Related Midwest, the master developer, describes housing and a hotel as potential Phase 1 additions around the stadium, with later phases expanding the district. A condo bought near Roosevelt this winter would sit next to a site where the stadium comes first, the funded six acres of parkland and the plaza come with the infrastructure, and new homes arrive in later phases on the developer's timeline.

The neighborhood conversation is still under way. South Side Weekly reported in March that a poll by a South Loop group found 73% of respondents supported the stadium, while housing advocates in nearby communities raised concerns about speculation and rent pressure. At the groundbreaking, Block Club reported that the Coalition for a Better Chinese-American Community and other groups were pressing for a community benefits agreement.

If you're weighing towers in the area, our South Loop guide to luxury rentals and concessions covers how move-in specials work there. For the ownership side, South Loop high-rise vs. townhome living compares the housing types near The 78.

Quick answers

When does McDonald's Park open? The Fire and its contractors are targeting the 2028 MLS regular season. The enclosure permit was issued in October 2026.

Will there be a new CTA station by the stadium? No. The planned Red Line station at 15th and Clark was dropped, according to WTTW's July 2026 report.

Is the stadium paid for with public money? The $750 million stadium is privately funded. The $424.9 million TIF package approved in July 2026 pays for the surrounding streets, river wall, Metra work, garage and public open space.

Comparing a tower near Roosevelt with one east of Clark, or deciding whether to sign before the stadium's first season? The Michael Scavo Group tracks South Loop move-in specials building by building, and we can line up tours on both sides of Clark so you can walk the game-night routes yourself. Start with our search tool and Find Your Apartment.

Work With Us